In accordance with AIM Rule 17, Goldplat plc (LON:GDP), the AIM quoted gold producer with international gold recovery operations based in South Africa and Ghana and a gold mine in Kenya, today announced a change to its registered office from 3rd Floor, 55 Gower Street, London, WC1E 6HQ, to Salisbury House, London Wall, London, United Kingdom, EC2M 5PS.
Goldplat plc is an AIM quoted gold producer with two market leading recovery operations in South Africa and Ghana and an operational gold mine in Kenya. The Company produced 42,857 ounces of gold during FY 2017, with 40,285 gold equivalent ounces sold and transferred, resulting in an operating profit from continuing operations of £2.9m for the year. This result does not benefit from the increased processing capacity that was achieved at the Kilimapesa Gold Mine towards the end of FY 2017, with operational profitability achieved during last two months of FY 2017. Accordingly, the Company believes it is well placed to build upon production and profitability during FY 2018.