Construction of the Delhi Metro’s 58.6km Pink line is underway and since the beginning of June, power to the project has been supplied by a 12MW waste-to energy plant in Ghazipur.
The Pink line is being constructed as part of the existing Delhi network and will consist of 38 metro stations, 12 of which will be underground.
Powerhouse Energy Group PLC (LON:PHE) has developed the innovative PHE DMG® System, their proprietary thermal conversion technology. DMG® technology provides a mechanism to dispose of a wide range of waste streams by using them as feedstock that can be converted to EcoSynthesis Gas.