NQ Minerals Hellyer gold mine plant production increased by 44%

NQ Minerals Plc (AQSE:NQMI) has announced that plant production at its flagship Hellyer Gold Mine in Tasmania, Australia, has now been successfully increased by 44% to over 1.3 million tonnes per annum (1.2Mtpa at 92% plant availability), compared to 2019’s full year plant production numbers.

The new production rate of 150 tonnes per hour (1.314Mtpa) is now being achieved after a June plant upgrade and circuit optimisation exercise. This new rate compares to 2019 Hellyer Full Year plant throughput totalling 835,877 tonnes (average 103 tph at 92% plant availability).

Process optimisation works are now underway to ensure that the plant achieves maximum recoveries and concentrate specifications at these new higher production rates.

Engineering assessments will continue to plan for further production rate increases later in the year, should higher production rates be required.

David Lenigas, Chairman of NQ Minerals Plc, said, “This Hellyer plant upgrade exercise has been successfully brought in some 6 months ahead of expectation. The increase in saleable mine product will have a very positive affect on the Company’s top and bottom line revenues going forward, and will assist NQ greatly with its ability to service ongoing debt obligations and strongly position the mine for increased profitability as commodity prices improve with the world emerging from the COVID-19 pandemic.”

About the Hellyer Gold Mine

Hellyer is NQ Mineral’s flagship mining operation.

The world class Hellyer underground mine, on the West Coast of Tasmania, in Australia, began production in 1989 under the ownership of Aberfoyle Limited. The Hellyer deposit had a published pre-mining Mineral Resource of 16.9Mt grading 13.8% zinc, 7.2% lead, 0.4% copper, 167g/t silver and 2.5g/t gold. The deposit was mined between 1986 and 2000 as a large-scale underground mine, with production peaking at around 1.5Mtpa with ore treated at the onsite Hellyer flotation concentrator plant. Lead and Zinc concentrates were taken to nearby Burnie Port for global shipment. Operations ceased by Aberfoyle/Western Metals at the Hellyer Mine in 2000, when economically available ore at the site became exhausted.

Hellyer has a published JORC compliant Mineral Resource estimated at 9.25Mt which is host to Gold at 2.57 g/t Au for 764,300 oz gold, Silver at 92 g/t Ag for 27,360,300 oz silver, Lead at 2.99% Pb for 276,600 tonnes of lead and Zinc at 2.57% Zn for 217,400 tonnes of zinc.

NQ Minerals purchased the Hellyer operations in 2017, and as Phase 1 of its Hellyer operational plan, NQ re-opened Hellyer in late 2018 with a tailing retreatment operation designed to last for at least 10 years. Production will initially focus on lead and zinc recovery from the reserves with significant gold and silver credits payable. Phase 2 of Hellyer’s re-opening plan is to re-open the rich underground mine, which has 1.175 million tonnes of underground JORC Resources grading 8.6% Zinc, 4.9% Lead, 96 g/t Silver and 1.66 g/t gold.

Click to view all articles for the EPIC:
Or click to view the full company profile:
    Facebook
    X
    LinkedIn
    NQ Minerals Plc

    More articles like this

    NQ Minerals Plc

    NQ Minerals now dual listed on the Frankfurt Stock Exchange

    NQ Minerals Plc (AQSE:NQMI), the green mining company with significant mining operations in Tasmania Australia, is pleased to announce the Company’s ordinary shares are now dual listed on the Frankfurt Stock Exchange (“FSE”). Trading commenced today

    NQ Minerals Plc

    NQ Minerals a very active year for news and growth (Interview)

    NQ Minerals plc (AQSE:NQMI) Executive Chairman David Lenigas joins DirectorsTalk to discuss the 2020 year-end operations update. David talks us through the highlights, expands on production rates that are better than originally forecast, tells us more about

    NQ Minerals Plc

    NQ Minerals sign a $55 million loan facility with ING Bank

    NQ Minerals Plc (AQSE:NQMI) has announced that its subsidiary Hellyer Gold Mines Pty Ltd and ING Bank N.V. have signed a US$55 million loan facility. The Company’s intention with respect to this facility was previously announced

    NQ Minerals Plc

    NQ Minerals raises £337,000 in equity raise

    NQ Minerals Plc (AQSE:NQMI), the base and precious metals producer from its Hellyer Gold Mine in Tasmania Australia, has announced that it has raised £337,000 (gross) at 7p per share from a UK based Institutional investor and a

    NQ Minerals Plc

    NQ Minerals see big jump in revenues and gross profits (Interview)

    NQ Minerals plc (AQSE:NQMI, OTCQB:NQMLF, US ADR OTCQB:NQMIY) Executive Chairman David Lenigas joins DirectorsTalk to discuss production results and unaudited financial results for its wholly owned Hellyer Gold Mines Pty Ltd. David talks us through the highlights,