Active Energy (AEG), an international biomass based renewable energy business, has announced Player Design, Inc. (PDI) has received the relevant permitting for the construction and operation of a CoalSwitch manufacturing facility at PDI’s site in Ashland, Maine.
The permit, granted by the Department of Environmental Protection in the State of Maine, will allow PDI to immediately commence the final stage of construction for the CoalSwitch production plant; and permit manufacturing operations at the CoalSwitch plant to commence. Under the terms of the Permit, PDI must provide certain additional data to the Department within an initial six-month period.
Active Energy Group plc (LON:AEG) is a biomass based renewable energy business focussed on using its proprietary technology to transform low-cost or waste biomass material into renewable biomass fuels, thus creating next generation biomass products. AEG’S CoalSwitch® is a second generation biomass fuel that has been tested, and proven, to replace the traditional coal fired-power industry and existing renewable biomass industry without requiring plant modification.