Zenith Energy announce drilling results at well C-37

Zenith Energy (LON:ZEN), the international oil & gas production company operating the largest onshore oilfield in Azerbaijan, today provided an overview of drilling results at well C-37 in the Jafarli oilfield.

Andrea Cattaneo, Chief Executive Officer of Zenith, commented:

“The Board of Directors is delighted with the result at C-37. Not only have we successfully concluded our first drilling operation in Azerbaijan utilising our own rig, but we are also on track to sizeably increase our daily production of oil. We now look forward with confidence to drilling operations in well C-30, the next well in our work programme, where all geological and technical data suggests we might achieve an even stronger result.”

The Company can confirm that well C-37 has successfully been drilled to a total depth of 4,350 metres accomplishing both its operational objectives of penetrating the highly prospective, unexploited intervals of the Middle Eocene formation, as well as testing the fluid content of the previously unexplored Upper Cretaceous (Mesozoic) formation.

As announced on September 9, 2019, three untapped oil-bearing clastic layers were identified in the Middle Eocene formation target zone, with a total net pay zone of approximately 16 metres.

Oil and gas shows recorded during drilling of these intervals indicated the presence of favourable reservoir facies. These findings were subsequently confirmed by a series of wireline logs performed by the Company in order to determine the intervals to be perforated in the Middle Eocene formation following the casing and cementing of well C-37.  

Wireline logging of the Upper Cretaceous formation target zone has confirmed, although having gone through a series of tectonic events, the consistence of clay and carbonate facies and provided important indications surrounding the potential productivity of the formation across the Company’s Azerbaijan asset.

Having completed wireline logging, the Company proceeded to run the casing with a liner hanger system to be followed by cementing operations. During these operations, the liner hanger system failed to set, making it impossible for the casing to be cemented. Zenith is investigating the reasons for the liner hanger failure with the manufacturer.

On account of the observed oil and gas shows from the Middle Eocene formation and wireline logging, it was decided to perform a cement plug operation to isolate the Upper Cretaceous formation and put the well in openhole production from the Middle Eocene formation.

The Company is currently evaluating a number of stimulation interventions including acidification, as well as the possibility of installing an ESP, to maximise production.

Initial testing of the well has indicated that well C-37, if placed on full production, can produce up to 100 barrels of oil per day with a water cut of approximately 50 percent. Zenith will establish and communicate a stabilised flow rate to the market in due course.

The Company will now perform a series of technical inspections on its 1,200hp drilling rig prior to it being rigged down in preparation for mobilisation to the next drilling location in the Jafarli oilfield, well C-30.  

Click to view all articles for the EPIC:
Or click to view the full company profile:
    Facebook
    X
    LinkedIn
    Zenith Energy

    More articles like this

    Zenith Energy

    Zenith Energy establish fully owned Norwegian subsidiary

    Zenith Energy (LON:ZEN), the international oil & gas production company, has today announced the establishment of its fully owned Norwegian subsidiary, Zenith Energy AS (“Zenith Norway”). As announced on December 9, 2019, Zenith intends to use Zenith Norway

    Zenith Energy

    Zenith Energy Private Placement on the Merkur Market

    Zenith Energy (LON:ZEN), the international oil & gas production company, has today announced a Private Placement on the Merkur Market of the Oslo Stock Exchange. The Company has successfully raised gross proceeds of NOK 11,105,882 (approximately

    Zenith Energy

    Zenith Energy appoint advisor for development in Africa

    Zenith Energy (LON:ZEN), the international oil & gas production company, has today announced that it has engaged Mr. Bienvenu Briss Aleba as an advisor in view of its planned future activities in the Republic of the

    Zenith Energy

    Zenith Energy Private Placement in Norway

    Zenith Energy (LON:ZEN), the international oil & gas production company, today announced a Private Placement on the Merkur Market of the Oslo Stock Exchange. The Company has successfully raised gross proceeds of NOK 7,700,000 (approximately £638,000

    Zenith Energy

    Zenith Energy Azerbaijan C-37 well update

    Zenith Energy (LSE:ZEN), the international oil & gas production company, has provided an update regarding well C-37 operations. Andrea Cattaneo, Chief Executive Officer of Zenith, commented: “The Company looks forward to achieving stabilised production from well

    Zenith Energy

    Zenith Energy acquire Coro Energy Italian Assets

    Zenith Energy (LON:ZEN), the international oil & gas production company, has announced that it has signed a share purchase agreement with AIM quoted Coro Energy Plc for the acquisition of Coro’s entire natural gas production and

    Zenith Energy

    Zenith Energy assigned “B+” with Stable Outlook Credit Rating

    Zenith Energy (LON: ZEN; TSX.V: ZEE; OSE: ZENA-ME), the international oil & gas production company, has announced that Rating-Agentur Expert RA has assigned Zenith a “B+” with Stable Outlook debt issuer credit rating. RAEX is an independent European Credit Rating Agency

    Zenith Energy

    Zenith Energy Highlights from quarterly results

    Zenith Energy (LON: ZEN; TSX.V: ZEE; OSE: ZENA-ME) the listed international oil & gas production company, has announced the filing of its consolidated quarterly results for the three and six month period ended September 30, 2019. In accordance with Canadian securities laws,

    Zenith Energy

    Zenith Energy Approval of Base Prospectus for EUR 25 million EMTNs

    Zenith Energy (LON:ZEN; TSX.V:ZEE; OSE:ZENA-ME), the international oil & gas production company, has announced the approval of its Base Prospectus for the issuance of EUR 25,000,000 unsecured, multi-currency Euro Medium Term Notes at par value on the Third Market (MTF)

    Zenith Energy

    Zenith Energy offer to acquire Nordic Petroleum AS

    Zenith Energy (LON:ZEN; TSX.V:ZEE; OSE:ZENA-ME), the international oil & gas production company, has announced that it has formalised an offer to acquire a Norwegian oil & gas company, Nordic Petroleum AS, by way of an exchange of equity.

    Zenith Energy

    Zenith Energy complete financing

    Zenith Energy (LON:ZEN; TSX.V: ZEE; OSE: ZENA-ME), the international oil & gas production company operating the largest onshore oilfield in Azerbaijan, has informed that has now fully closed the private placing on the Merkur Market of the Oslo Borse.

    Zenith Energy

    Zenith Energy successfully further reduces its debt position

    Zenith Energy (LON:ZEN; TSX.V: ZEE; OSE: ZENA-ME), the international oil & gas production company operating the largest onshore oilfield in Azerbaijan, announced that it has successfully further reduced its debt position with a specific focus on the elimination of

    Zenith Energy

    Zenith Energy Increased participation in Norwegian Private Placement

    Zenith Energy (LON: ZEN; TSX.V: ZEE; OSE: ZENA-ME), the international oil & gas production company operating the largest onshore oilfield in Azerbaijan, announced the closing of the Private Placement on the Merkur Market of the Oslo Stock Exchange first announced to

    Zenith Energy

    Zenith Energy announce Private Placement in Norway

    Zenith Energy (LON:ZEN; TSX.V: ZEE; OSE: ZENA-ME), the international oil & gas production company operating the largest onshore oilfield in Azerbaijan, announced a Private Placement on the Merkur Market of the Oslo Stock Exchange. The Company has successfully raised