Bluejay Mining PLC (LON:JAY), the AIM and FSE listed company with projects in Greenland and Finland, is pleased to announce that is has changed its registered office to 7-9 Swallow Street, London, W1B 4DE with immediate effect.
Bluejay Mining is dual listed on the London AIM market and Frankfurt Stock Exchange and primarily focussed on advancing the Dundas Ilmenite Project (previously known as the Pituffik Titanium Project) in Greenland into production in 2018.
Dundas has been proven to be the highest-grade mineral sand ilmenite project globally, with an initial Inferred mineral resource of 23.6Mt at 8.8% ilmenite (in situ) reported according to the JORC Code, including a high-grade zone equal to 7.9Mt at 14.2% ilmenite. Crucially significant further upside remains, as the resource forms part of a larger exploration target for the tested area of between 90Mt to 130Mt at an in-situ grade of between 6.3% and 8.4% ilmenite. While this exploration target is conceptual in nature, at the time of its definition there was insufficient exploration to estimate a mineral resource and it was uncertain if further exploration will result in the estimation of a mineral resource. This remains the case at the time of writing, although the pending results of the 2017 exploration programme will result in its reappraisal. Furthermore, the mineral resource area covers just ~17% of the raised beach area and is only one of the following three main target areas situated along an >40km coastline:
· Raised beaches; containing ilmenite accumulations over widths of more than 1km, of unknown depths, along more than 30km of coastline;
· Active beaches; which refer to the area seaward of the frontal dunes, including the beach, tidal zones and surf zone; and
· Drowned beaches; refers to the areas seaward of active beaches.